Public works payroll for multi-project contractors means filing a separate certified payroll for each covered project every week, even when one worker splits the week across several jobs. Each report shows only that project’s hours, but some columns must reflect the worker’s whole week.
Errors start with that split, because each project has its own wage determination, payroll numbering, and submission. A worker’s overtime, deductions, and fringe credit depend on hours and pay outside any single project, including private work. One wrong split can put two reports out of compliance at once.
Multi-project certified payroll is the weekly process of dividing each worker’s hours, pay, and fringe by project and classification. Each covered project is then reported on its own certified payroll, which also shows the worker’s total gross pay and deductions for all work.
Multi-project contractors need five terms to split a worker’s week correctly.
Run multi-project certified payroll by capturing hours by project and classification first. Then build one report per covered project from that same data.
Most multi-project information goes in the classification, hours, and gross pay columns of the revised WH-347.
| WH-347 field | What multi-project contractors enter |
|---|---|
| Wage Determination No. | Every wage determination that applied to work on this project this week |
| Columns 1A and 3 | One row per classification, using the same worker entry number |
| Column 4 | Hours worked on this project only |
| Column 7A | Gross earned on this project |
| Column 7B | Gross earned for all work that week, including non-covered projects |
| Column 8 | Actual deductions from all work, not prorated |
| Column 9 | Net pay for all work across all projects |
The best practice is to reconcile every worker’s week before any report goes out. Hours across all project reports, plus any private work, should equal the worker’s total timecard.
eBacon’s Certified Payroll product page shows how hours captured by project and classification flow into each WH-347.
Avoid these five mistakes, which all come from treating each project as its own payroll instead of part of one worker’s week.
Multi-project public works payroll works when you capture hours once, by project and classification, and build every report from that record. Start by checking how your team records project and classification at clock-in, since every later step depends on it.
eBacon is the only construction-focused platform featuring certified payroll with a money-saving fringe trust. All-in-one software with scheduling, GPS-enabled time tracking, safety system, and inventory management for contractors with 15 to 500 employees.
You can watch eBacon split one worker’s week by project and classification and build each project’s WH-347 in a free product tour. Book your eBacon product tour.
Yes. Each covered project gets its own weekly certified payroll with its own payroll number, starting at 1. A worker who splits the week across three covered jobs appears on three reports, and each report shows only that project’s hours and gross pay.
Report the project’s gross pay in Column 7A and the worker’s total gross pay for all work in Column 7B. Column 7B includes pay from non-covered and private projects, so every report for that worker shows the same weekly total.
No. DOL instructions say not to prorate deductions. Show the actual deductions taken from the worker’s total weekly pay for all work, then show net pay for all work in Column 9.
Fringe credit is generally annualized by dividing the benefit’s cost by all hours the worker works on public and private jobs. A limited exception exists for certain defined contribution pension plans, and DOL Fact Sheet #66E explains the criteria. eBacon annualizes fringe credits automatically and generates the WH-347 from the same payroll data.
Keep payroll and basic records for at least three years after all work on each prime contract is complete. Each project’s three years starts when that prime contract’s work ends, so records from a longer project stay on file longer.