How Does Public Works Payroll Work When Crews Move Between Projects?

Public works payroll for multi-project contractors means filing a separate certified payroll for each covered project every week, even when one worker splits the week across several jobs. Each report shows only that project’s hours, but some columns must reflect the worker’s whole week.

Errors start with that split, because each project has its own wage determination, payroll numbering, and submission. A worker’s overtime, deductions, and fringe credit depend on hours and pay outside any single project, including private work. One wrong split can put two reports out of compliance at once.

Multi-project certified payroll is the weekly process of dividing each worker’s hours, pay, and fringe by project and classification. Each covered project is then reported on its own certified payroll, which also shows the worker’s total gross pay and deductions for all work.

What Public Works Payroll Terms Do Multi-Project Contractors Need to Know?

Multi-project contractors need five terms to split a worker’s week correctly.

  • Wage determination: The list of classifications and minimum rates for a project. Each project can have different ones.Certified Payroll Contractors At Public Works Site
  • Labor classification: The type of work actually performed, such as laborer or electrician. One worker can have several in a week.
  • Certified payroll number: The weekly report number for one project, starting at 1 on each project.
  • Gross amount earned for all work: The worker’s total weekly pay across every job, including non-covered work.
  • Annualization: Spreading a fringe benefit’s cost across all hours a worker works, on public and private jobs.

 

How Do You Run Certified Payroll Across Multiple Projects Step by Step?

Run multi-project certified payroll by capturing hours by project and classification first. Then build one report per covered project from that same data.

  1. Identify every covered project for the week. Each one needs its own weekly certified payroll. List every wage determination that applied to work on that project that week.
  2. Capture hours by project and classification. Record hours as crews clock in, not from memory on Friday. eBacon has employees select their classification at clock-in and attaches the project to every GPS punch. It then applies the correct prevailing wage rate and fringe to each block of time.
  3. Apply the right rates, overtime, and fringe. Pay each classification’s rate for the time worked in it. Check the worker’s total weekly hours before labeling any project hours as overtime. Annualize fringe credits across all hours worked, public and private, unless a DOL exception applies.
  4. Build each project’s WH-347. Show that project’s hours and gross pay, plus the worker’s gross pay, deductions, and net pay for all work.
  5. Sign, submit, and keep records. Sign a Statement of Compliance for each report. Keep payroll records for at least three years after all work on the prime contract is complete.

Where Does Multi-Project Information Go on the WH-347?

Most multi-project information goes in the classification, hours, and gross pay columns of the revised WH-347.

WH-347 field What multi-project contractors enter
Wage Determination No. Every wage determination that applied to work on this project this week
Columns 1A and 3 One row per classification, using the same worker entry number
Column 4 Hours worked on this project only
Column 7A Gross earned on this project
Column 7B Gross earned for all work that week, including non-covered projects
Column 8 Actual deductions from all work, not prorated
Column 9 Net pay for all work across all projects

 

Watch Our Video

Watch this webinar and learn all about the Wh-347 certified payroll form. A step-by-step guide to filling it out correctly.

 

What Are the Best Practices for Multi-Project Public Works Payroll?

The best practice is to reconcile every worker’s week before any report goes out. Hours across all project reports, plus any private work, should equal the worker’s total timecard.

  • Load each project’s wage determination before the first clock-in.
  • Never copy classifications from a prior project.
  • Track missing timecards early in the week.
  • Mark the final payroll box when work on a project ends.
  • Confirm each state agency’s forms and portal before a state prevailing wage job starts.

eBacon’s Certified Payroll product page shows how hours captured by project and classification flow into each WH-347.

 

Which Multi-Project Certified Payroll Mistakes Should You Avoid?

Avoid these five mistakes, which all come from treating each project as its own payroll instead of part of one worker’s week.

  • Prorating deductions. DOL says to show actual deductions from the worker’s total weekly pay.
  • Reporting only project pay in Column 7B. That column covers all work, including private jobs.
  • Skipping the classification breakdown. Without accurate records, the worker must be paid the highest applicable rate for all hours.
  • Dividing fringe costs by covered hours only. Annualization generally requires all hours, public and private.
  • Checking overtime one project at a time. Overtime depends on the worker’s total weekly hours.

What Does This Mean for Your Payroll Team?

Multi-project public works payroll works when you capture hours once, by project and classification, and build every report from that record. Start by checking how your team records project and classification at clock-in, since every later step depends on it.

What is eBacon?

eBacon is the only construction-focused platform featuring certified payroll with a money-saving fringe trust. All-in-one software with scheduling, GPS-enabled time tracking, safety system, and inventory management for contractors with 15 to 500 employees.

How Can I See eBacon Run Certified Payroll Across Multiple Projects?

You can watch eBacon split one worker’s week by project and classification and build each project’s WH-347 in a free product tour. Book your eBacon product tour.

Frequently Asked Questions About Multi-Project Public Works Payroll

Do I need a separate certified payroll for each public works project?

Yes. Each covered project gets its own weekly certified payroll with its own payroll number, starting at 1. A worker who splits the week across three covered jobs appears on three reports, and each report shows only that project’s hours and gross pay.

How do I report gross pay for a worker on more than one project?

Report the project’s gross pay in Column 7A and the worker’s total gross pay for all work in Column 7B. Column 7B includes pay from non-covered and private projects, so every report for that worker shows the same weekly total.

Should I split deductions between projects on certified payroll?

No. DOL instructions say not to prorate deductions. Show the actual deductions taken from the worker’s total weekly pay for all work, then show net pay for all work in Column 9.

How is fringe credit calculated when workers do public and private work?

Fringe credit is generally annualized by dividing the benefit’s cost by all hours the worker works on public and private jobs. A limited exception exists for certain defined contribution pension plans, and DOL Fact Sheet #66E explains the criteria. eBacon annualizes fringe credits automatically and generates the WH-347 from the same payroll data.

How long do I keep certified payroll records for multiple projects?

Keep payroll and basic records for at least three years after all work on each prime contract is complete. Each project’s three years starts when that prime contract’s work ends, so records from a longer project stay on file longer.